top of page
STRUCTURAL RECOVERY BRIDGE BECCA PAVIA
Restoration of the bridge with rapid emergency intervention after the collapse of the support pylons, under the constant guidance of the Province of Pavia, in collaboration with the company Damiani Costruzioni SARL.
Use of Dywidag plates, reinforcement angles, bolts and bars to ensure stability and allow reopening to vehicle transit.
​
Features:
​
Year of construction: 1912
​
Length: 1080 m
image
image (2)
image (1)
image
1/3
bottom of page